We have all seen the massive amounts of volunteer labor that is generally required for sandbagging operations. It takes time to put together the workforce and can be chaotic and inefficient.
By utilizing the SandMaster to fill and place the bags, the workforce can be reduced, response times improved, and more properties saved. Volunteers can be better utilized for building the temporary berms and dikes instead of filling the bags.
The SandMaster attachment is very durable, easy to use, has very few moving parts and made in the USA. With the capability of creating and placing 4,800-6,200 bags in 8 hours with only 3 people, protection for homes businesses and communities can be provided quickly with far less labor than conventional sandbagging operations.
With emergency flood protection being such a time sensitive need, being able to swiftly respond and deploy sandbags could be the difference between PRESERVATION and DEVASTATION.